
Paint goes on near the end of a renovation, after the dusty, messy work is finished but before the final fit-off and new flooring. Get the timing wrong and you’ll end up paying to paint the same walls twice.
Here’s where painting fits, and why.
The Usual Order of Trades
Every renovation is a bit different, but most follow this order:
- Demolition and strip-out
- Structural work (walls, framing, windows)
- Rough-in (plumbing and electrical inside the walls)
- Insulation
- Plastering (sheeting, setting, sanding)
- Cabinetry and joinery installed
- Tiling (bathrooms, kitchen splashbacks)
- Painting ← here
- Fit-off (light switches, power points, tapware, handles)
- Flooring (carpet, timber, vinyl)
- Final clean and touch-ups
Why Painting Comes After the Plasterer
Fresh plaster and set joints need to be completely dry before painting. Painting too early can leave visible joint lines, patchy sheen or paint that doesn’t stick properly. New plaster also needs a sealer or primer coat first, because it soaks up paint unevenly.
See our guide on whether you should prime before painting.
Paint Before or After New Flooring?
Usually before carpet, and often before timber floors.
- Carpet goes in after painting. Drips on bare concrete or floorboards don’t matter. Drips on new carpet do.
- Timber, hybrid and vinyl are usually laid after painting too, with skirting boards given their final coat or touched up after the floor goes in.
- Polished floorboards are trickier. Sanding creates fine dust that settles on fresh paint. Many painters do everything except a final coat, then finish after the floors are done.
Talk to both trades and agree on the order before work starts.
Paint Before or After the Kitchen Goes In?
Most painters prefer to paint after the cabinets are installed but before the benchtop splashback is finished. That way, walls are painted right up to the cabinets with clean edges, and no paint ends up on new benchtops.
Why Painting Too Early Costs You More
Painters see the same problems on many renovations:
- Electricians cutting new holes in freshly painted walls
- Cabinet installers scuffing walls and corners
- Plaster dust from sanding settling on wet paint
- Tilers marking walls with adhesive
- Floor sanding dust ruining a finished paint job
Each of these means patching, sanding and repainting, which you pay for.
Tips for a Smooth Renovation Paint Job
- Book your painter early. Good painters are busy, so give them your rough timeline at the start.
- Choose colours before plastering finishes. Waiting for samples can hold up the whole job.
- Leave a gap after plastering. Let joints dry properly.
- Plan one final touch-up visit. After fit-off and flooring, there are always a few marks to fix.
- Protect finished work. Ask other trades to cover painted walls and doors when they’re working nearby.
Painting Older Homes During a Renovation
Older Adelaide homes come with their own issues: salt damp on masonry walls, old lead-based paint, and cracked plaster. Deal with these before painting. Read our guide to salt damp in Adelaide homes.
Get a free renovation painting quote
FAQs
Before. Painting first avoids drips on new carpet. Skirting can be touched up after it’s laid.
Only once the plaster and joints are completely dry. Your painter should check before starting, and new plaster always needs a sealer coat first.
If you have a builder, they usually set the order of trades. If you’re managing the renovation yourself, talk to each trade and agree on the order before work starts.
Often yes, but it’s easier and faster if rooms are empty. Ask your painter how to plan around living there.



